Hero background image

Norway Data Center Campus - N01

The world's largest data center campus powered by 100% green energy


How can we help?
Hero background image
Norway Data Center Campus - N01

Located next to Europe's largest renewable sub-station


How can we help?
Hero background image
Norway Data Center Campus - N01

Powered by 100% low carbon power


How can we help?
Hero background image
Norway Data Center Campus - N01

3km² zoned for data centers


How can we help?

Welcome to our N01 Campus in Norway - Europe's largest sustainable data center campus

Looking for flexible, long-term, sustainable and energy efficient Norwegian data center solutions to meet your Gen AI and HPC capacity and power needs? Then Bulk's N01 Campus is the right choice for you.

Located in Southern Norway's Agder region, just outside Kristiansand, Norway with good access to international flights, the campus lies on a 300-hectare (3km²) site located next to the largest transformer station in Europe, with direct and redundant connections to multiple hydropower stations supplying 100% renewable energy.
 

With three subsea cables terminating at the campus and four terrestrial routes, N01 is ideal for both international and national organizations seeking power availability, ultra scalability, sustainability, and connectivity options.

Find out why Norway is the perfect destination for your IT workloads.

A Norwegian sustainable data center campus to meet your Generative AI and HPC needs

Hyper Scale

Massive scalability across 3km² and up to 1GW power, N01 meets the need for high-density computing, colocation, and purpose-built facilities.

Power resiliency

By directly linking to the adjacent substation, we minimize electrical losses and grid costs. With over 12 independent feeds, we ensure maximum availability at minimal expense.

Power availability

Adjacent to Europe's largest renewable substation, we tap into abundant renewable sources for affordable and reliable power supply - directly linked to Bulk's 125MVA high-voltage primary substations.

Connectivity

Highly connected via sub-sea and terrestrial networks - offering carrier-neutral, large-capacity fiber connectivity to the US and Europe.

Nvidia Preferred Partner

Our NVIDIA Ready data centers deliver infrastructure that meets the demands for high-specification hosting for AI and HPC workloads. Our solutions, combined with excellent global connectivity network accelerate the scaling of AI technology.


thumbnail

New 42MW facility currently under construction

Dedicated colocation facility designed to support high-density GPU and CPU infrastructure. DCM102 is part of the world’s largest 100% green energy-powered data center campus.
 

  • Ultra scalable to suit future growth
  • Technology agnostic but future proof with ability to deploy high-density
  • Total white space - 4,100m²
  • Total IT capacity - 42MW
  • IT capacity per hall - 10.5MW
  • 100kW+ per rack
  • Low energy costs and high efficiency cooling system (air cooling and direct liquid cooling)
  • Secure solutions with dedicated white space or cages with security measures to suit
     
thumbnail

Hydropower production in Norway and Agdar region

How is hydropower produced?

Norway is one of the most sustainable countries in the world.  Over 90% of our electricity comes from hydropower. This abundant sustainable resource not only powers our facilities, it also powers our homes, industries, and helps reduce our carbon footprint. 

N01 resilient power supply

The Agdar region has 39% of Norway's reservoirs and the region produces 33.9TWh of Norway's electricity. With over 12 independent feeds into N01 Campus, we ensure maximum availability at minimal expense. 

Customer Testimonials

Intility selects Bulk Data Centers to support redesign of core data center platform

We need to be thorough when we choose partners because we make the choice on behalf of hundreds of customers. We look in particular at security, but also sustainability, connectivity, compliance and certifications. Bulk was a natural choice.

Genesis Cloud selects Bulk Data Centers to host its expanding cloud platform

Partnering with Bulk allows us to scale-out our capacities in Norway while staying true to our mission. Our customers will continue to get the most performance per dollar with even lower latencies towards Europe without sacrificing their commitment to the use of green energy.

Power and reliability for an AI/ML-powered fintech enterprise.

When we set out to look for additional data center space to build our new HPC research cluster, we set ourselves two goals. Sustainability is really important to us and so first and foremost we needed to find a renewable source of energy. Secondly, we had to ensure that the solution was cost effective, especially given the scale.

Latest news

Richard Brandon joins Bulk Infrastructure as Chief Development Officer
11 Oct 2024 Press Release | Data Center
Bulk doubles IT capacity at Oslo data center
22 May 2024 Press Release | Data Center
Taiga Cloud, continues rollout of NVIDIA H100 GPUs
19 Mar 2024 Data Center | Industry News
A new report shows the data center industry in Norway is booming
21 Feb 2024 Data Center | Industry News
1 2 3 4 Next