Oslo, Norway and Sterling, Virginia USA – October 9, 2021 – Bulk Fiber Networks, a leading builder and operator of fiber network infrastructure in the Nordics, and WFN Strategies, a leading submarine cable planning, engineering, and implementation firm, together announce commencement of a feasibility study for the prospective Leif Erikson cable project, unlocking the global renewable giants Norway and Canada.
The Leif Erikson Cable System will consist of a 4.200 km direct link between southern Norway and Atlantic-Canada connecting into Goose Bay, including plans to extend the system terrestrially back to Montreal. The Leif Erikson system will be the first trans-Atlantic cable powered with 100% renewable energy in line with Bulk’s vision to bring sustainable infrastructure to a global audience.
The Leif Erikson subsea fiber cable will form a northern route between Norway and Canada with 100% renewable energy feed from both sides of the Atlantic.
